Friday, September 30, 2005

Project list

The sunroom is tiled. I will be installing the woodstove in it on Saturday. All there is left is to attach the stove pipe to the chimney, so other than making one cut it should go smoothly.

I've had two plumbers give me bids on the basement, and another coming in tonight. So far it looks to be around $3k. I've already begun breaking up the floor. It is going fairly well (the cement doesn't seem to be of much quality). I have located the sewer pipe and now all I have to do is expand from there to the new sources, sauna drain, toilet, shower, and laundry & lav sink.

As soon as I find out when the plumbing will be done I will be sending out for help from the experienced sauna builders I know.

Once I figure out how to post pictures I will put up the sunroom and the basement pics.

Bill

Thursday, September 29, 2005

Check back when you wish

I will be trying to use this to post pictures of the baby when it arrives and as it grows.

So check back and enjoy the baby and maybe a story or two.

Bill